Paving Guide

Adelaide paving process, explained straight

Most people only pave a driveway or patio once, so it's hard to know what actually happens on site. This guide covers what moves the price up or down, which pavers suit which job, how a proper paved area gets built, and how long it takes. We're across Adelaide's soil, levels and council requirements every week, and we'd rather you understood the job before you ask for a quote.

The variables

What changes the price

Area and shape

Bigger areas cost more overall but less per square metre. Lots of cuts, curves and borders add labour.

What's under the ground

Old concrete, rock or soft fill all change how much we excavate and how deep the base goes.

The paver you choose

Concrete pavers are the value option. Clay, porcelain and natural stone cost more in material.

Site access

If a machine can't get to the area, everything is carted by hand and the labour goes up.

Drainage and levels

Falls, pits and stormwater connections are quoted up front as part of the job, not added later.

Extras

Steps, retaining walls and demolition of the existing surface are priced separately and openly.

Materials

Which paver suits your job

Concrete pavers

Best for Driveways and value patios

Hard-wearing, consistent in size and available in a wide range of colours and textures. The most common choice for Adelaide homes.

Clay brick pavers

Best for Herringbone driveways and traditional homes

Colour runs right through the brick, so chips and wear don't show. Lays beautifully in herringbone and basketweave patterns.

Porcelain

Best for Alfresco areas and pool surrounds

Sleek and modern with tight joints. Won't fade or stain easily, and the cooler surface suits outdoor entertaining.

Natural stone

Best for Architectural and premium projects

Travertine, bluestone and granite. Laid with care for jobs where the finish matters as much as the build.

The build

How a paved area is built

01

Assess and measure on site

We look at the ground, the levels, drainage and access, then measure the area properly. The quote is built from that, not from a guess.

02

Set out and excavate

The area is marked to the finished heights, then excavated to the right depth for the load it will carry.

03

Base and compaction

Compacted road base goes down in layers — 100mm minimum for paths and more for driveways and vehicle areas. This is what stops pavers sinking.

04

Bedding and laying

A screeded bedding layer, then the pavers laid to pattern with string lines and straight edges held tight.

05

Edge restraint

Concrete or mortar edging locks the pavers in place so the field can't spread outwards over time.

06

Joints, clean-up and sealing

Joints are filled and compacted, the site is cleaned, and sealing is arranged if you want it.

Questions

Common paving questions

Do I need council approval for paving?

Usually no for paving inside your property. If the work involves a crossover or footpath on council land, approval is required — tell us early and we'll factor it into the program.

How long does a paving job take?

A typical residential driveway takes 3–5 working days. Patios and paths are often quicker. Larger projects, or jobs with demolition and retaining, run longer.

How soon can I park or walk on new paving?

You can walk on it straight away. Keep vehicles off a driveway for about 24 hours, and longer if it has been sealed.

Does new paving need maintenance?

Very little. Keep joints topped up as sand washes out, and re-seal every 2–4 years depending on traffic and exposure. We offer aftercare packages for past clients.

Do you quote over the phone?

We quote after we've seen and measured the site. It's the only way to give a number that holds, because base depth, access and levels change the cost so much.

More detail on each service is on our services page, and you can see finished jobs in our work.

Want a real number for your job?

We'll come out, measure the area and quote it properly — no guesswork.